**Official "Not Until Next Fiscal Year (Oct. 2010)" Thread**

Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

Was told by EM that we'd start hearing things in August or September in terms of what needs refreshing and all. Was also given a range of Jan to Mar for our facilities.
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

I sent in my change of address twice, since we're going ahead and moving from Nashville to St. Louis, but I still haven't gotten a confirmation from AQ yet. I need to know it was received in the event I actually get an FOL!

I quietly passed my two year application anniversary on June 29th, then subsequently tore my ACL the next day at a company softball game. This could be an interesting few months.
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

I finally got a call back from AQ this morning... and it wasn't good news. Preliminary numbers have my facility down as having no slots for FY2011, as well as a large portion of the Central terminal region. She asked if I'd be willing to accept a redirect, but with a wife establishing residency to go to grad school, I can't do that. Looks like I'll be waiting until October 2011 now... and once the numbers officially come in, and I know for sure that my 2010/2011 is screwed as well, I'll start a new thread.

This means that if I get a slot in FY2012, I will have waited three years for a training date. I'm currently second in line at my facility, too, and it's a small facility. I could be waiting a while. :(
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

Pssst... there are grad schools in every state in the union.
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

Pssst... there are grad schools in every state in the union.

Yeah, there are... but with a wife that is very family-focused and who wants to be close to her family (part of the reason we moved to St. Louis), you can't just pick any state... it's basically St. Louis or Nashville, and Nashville is more backed up with folks waiting for class dates than all three STL facilities combined.
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

I finally got a call back from AQ this morning... and it wasn't good news. Preliminary numbers have my facility down as having no slots for FY2011, as well as a large portion of the Central terminal region. She asked if I'd be willing to accept a redirect, but with a wife establishing residency to go to grad school, I can't do that. Looks like I'll be waiting until October 2011 now... and once the numbers officially come in, and I know for sure that my 2010/2011 is screwed as well, I'll start a new thread.

This means that if I get a slot in FY2012, I will have waited three years for a training date. I'm currently second in line at my facility, too, and it's a small facility. I could be waiting a while. :(

I just found out yesterday that ZFW has no slots for FY2011! :( Makes me sad...
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

I was just at ZFW today. I am currently at DFW TRACON and thought ZFW was a cool place, but there were alot of trainees there it seemed.


UTAMAV:bandit:
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

I was just at ZFW today. I am currently at DFW TRACON and thought ZFW was a cool place, but there were alot of trainees there it seemed.

Hey, thought you dropped off the face of the Earth. How you liking it?
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

I was just at ZFW today. I am currently at DFW TRACON and thought ZFW was a cool place, but there were alot of trainees there it seemed.


UTAMAV:bandit:
At the TRACON now? Are you by any chance familiar with an instructor named Brown? That'd be my father. Ha. My husband and I went in there with him a few months ago for a tour. We haven't been allowed in since 9/11, so that was cool. It'd be even cooler if we could get our geoprefs emails or something. :/
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

Um... so I don't know which gods I appeased, but I just got a call from AM... I have... a...

:rawk::rawk:CLASS DATE! :rawk::rawk:

I start September 10th!!
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

No way . That is amazing. Hopefully that means more good news is on the way. I sent AQ and email on Friday and haven't gotten a response yet. Maybe she is working on my date too. I can only hope.
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

Congrats. Sounds like they might be giving that month of notice the last mass email promised.
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

Um... so I don't know which gods I appeased, but I just got a call from AM... I have... a...

:rawk::rawk:CLASS DATE! :rawk::rawk:

I start September 10th!!

Congratulations to you, UGH for me. As of last week, no need for my facility, not doing redirects yet. Call back in October. UGH.
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

Of course, if you get a class date for some time in FY2010, you will be excommunicated.

Oh crap, I think I just kicked myself out.

gourgi18 - I had updated my address in the middle of last month because we moved, and AQ told me at that time that even preliminary numbers for FY2011 showed my facility had no hiring slots, but then she just randomly called me yesterday and offered me a class date that actually starts at the end of this fiscal year (even though I won't report to the facility until next FY)... so when HR says that hiring numbers can change on a daily basis, they aren't kidding. I was so flustered and in shock that I couldn't even think to ask her what had changed that gave me a class date when I had been told both last year and this year that I was out of luck until 2012.

I wanted to correct my previous post and change "AM" to "AQ", but I can't find the blasted Edit button.
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

Grats, Jerms, glad the end's in sight for you.

Also, I now hate you.
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

so they are doing lottery drawings this month. Congrats to all who got a class date.:clap:
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

Congrats, Jerms!

I was told shortly after my PEPC that I would also be put off until the next fiscal year, and yet got a call a few weeks later for a class in the current fiscal year. Like you said, just because they say one thing, doesn't make it absolute.
 
Re: **Official "Not Until Next Fiscal Year (Oct. 2010)" Thre

Just got off the phone with AQ and.... SEPT 20 OKC. It's about time.
 
Back
Top