RamRise
Well-Known Member
I fly for a 135 commuter operation which is also authorized for on-demand operations.
My understanding from the company is for scheduled operations the maximum flight time is 8 hours, even though we are a two pilot crew. 135.265 is clear up to the portion about two pilot crews:
135.265(a)(5) says total flight time in all commercial flying cannot exceed "8 hours between required rest periods "
Is that even English ? Is it saying 8 hours is the absolute minimum rest even though the reg originally refers to flight time amounts ?
I ask becuase recently we were asked by operations to accept another leg on to our day (non scheduled I presume since it would have altered our flight schedule) that would've put us over 8 hours. Is this permissible for a two pilot crew or not (assuming we could meet the rest requirements)?
The reg seems clear as mud on this...or maybe that's because I don't have a law degree.
My understanding from the company is for scheduled operations the maximum flight time is 8 hours, even though we are a two pilot crew. 135.265 is clear up to the portion about two pilot crews:
135.265(a)(5) says total flight time in all commercial flying cannot exceed "8 hours between required rest periods "
Is that even English ? Is it saying 8 hours is the absolute minimum rest even though the reg originally refers to flight time amounts ?
I ask becuase recently we were asked by operations to accept another leg on to our day (non scheduled I presume since it would have altered our flight schedule) that would've put us over 8 hours. Is this permissible for a two pilot crew or not (assuming we could meet the rest requirements)?
The reg seems clear as mud on this...or maybe that's because I don't have a law degree.