Maurus
The Great Gazoo
A positive thing would be if the company didn’t find it necessary to run right up to the scope limit and to replace this flying with E190+ Size aircraft. Status quo, or adding 1 small RJ for 1 larger ac, is not a positive.
Of course it would be better but that is up to you and the APA when negotiations open. I'm just saying we are trending in a positive direction. Mainline is growing rather than having flying replaced by RJs.