subpilot
Squawking 7600
My airport has taxiway closures for the next few weeks and so the tower has requested our flight school to request full length landings which in there description means to land on the displaced threshold, thus allowing our aircraft to clear the runway before the construction area begins. I can't find the official or legal meaning of "full length landing" (besides requesting to use the full length on the landing roll) or any exceptions that would allow landing on the displaced threshold. Is this operating practice okay and would it most likely require a local waiver or could I request this anywhere I land at that has a displaced threshold?